The work
- Private and rural access roads. New roads and upgrades of gravel tracks, sealed with asphalt or spray seal.
- Estate and subdivision roads. Pavement and surfacing for residential developments and retirement villages.
- Industrial yards and hardstands. Pavements for trucks, forklifts and heavy turning.
- Forecourts and commercial accessways. Large paved areas that carry steady traffic.
Pavement starts with the subgrade
A road's life is set by the ground it sits on, the thickness and quality of the pavement layers, and how well water is kept out of them. Subgrade strength, moisture, traffic volume and the share of heavy vehicles all inform the pavement. On projects with an engineered design or council specification, that design governs the work.
The typical sequence is clearing and earthworks, subgrade preparation, placing and compacting base layers to level, drainage works, then the wearing surface: hot-mix asphalt or a sprayed seal.
Asphalt or seal on a road
Hot-mix asphalt suits roads with turning traffic, intersections, cul-de-sacs, urban estates and heavy-duty areas. Sprayed seals are widely used on rural and lower-traffic roads and cover long lengths efficiently. Some projects combine both, with asphalt at intersections and turning areas and seal elsewhere.
Working with builders and developers
Bring us in early. Access for trucks and pavers, the order of trades, service crossings and inspection hold points all affect the programme. We work from your drawings and specification and confirm the scope in writing before starting.
Questions we get about road and civil work
Do you work from engineering drawings and specifications?
Yes. Where a project has an engineered pavement design or council specification, the work is scoped and built to it. Send the documents with your enquiry.
Can you upgrade a gravel road to a sealed road?
Yes. The existing gravel is assessed, reshaped and topped up with new road base where needed, compacted, then sealed with spray seal or asphalt.
Do you do the earthworks as well as the surfacing?
Base preparation, grading and compaction are part of our work. Tell us the full scope, including clearing or bulk earthworks, and we will confirm what is included.
What information do you need to quote a road?
Location, length and width, any plans or specifications, the traffic expected, the current ground or surface, and photos. Access constraints and timing help too.
