The short answer
An asphalt or spray seal quote depends on the area, the base preparation needed, drainage work, the pavement the vehicles require, machinery access and staging, and finishing such as edges and line marking. A rate per square metre covers only part of this, so compare quotes by what each one includes.
The main cost drivers
- Area and shape. Larger areas spread set-up costs; narrow or irregular shapes take longer.
- Removal. Breaking out and disposing of old concrete, asphalt or soft ground.
- Base work. New road base, its depth, and compaction.
- Drainage. Regrading, pits, kerbs or connections.
- Pavement. Thickness and mix for the vehicles using it.
- Access and staging. Machinery access, working around a home or trading business, after-hours work.
- Finishing. Edges, joins to concrete, line marking, signage.
Why rates per square metre mislead
Two quotes at a similar rate can describe very different jobs: one with excavation and new base, one laying straight over what is there. The second will look cheaper and may fail sooner. Ask what the rate includes before comparing.
Compare quotes line by line
| Check | What to ask |
|---|---|
| Removal | What existing material is removed, and is disposal included? |
| Base | How much new road base, and how is it compacted? |
| Surface | Asphalt or seal, and what thickness or seal type? |
| Drainage | Where will water go, and is any drainage work included? |
| Edges | How are edges and joins to concrete or kerbs finished? |
| Extras | Line marking, signage, traffic management, council crossover. |
| Handover | When can it be used, and what aftercare is needed? |
Getting an accurate quote faster
Send the suburb, rough dimensions, photos of the whole area and any problem spots, the current surface, the vehicles that use it, and any timing constraints. A site measure confirms the details.
General information only. Every site is different; a site assessment confirms what yours needs.
